hello groupim finally assembling my dome, for the retention bar install, is drilling holes required? or are there holes alreadyRussell
Steven
thank you that’s great!
I’m just about to start assembling the dome, I can just install the retention bar during the dome Assembly
Russell
There is no need to drill any holes to install the retention bars. They use pre-existing bolts and nuts to attach to the roof. Here's the link for download of the instructions: https://www.nexdome.com/resources
Steven